Supply of Inclinators for Interim Arrival Domestic Terminal Project
CMC Services for Inclinators for 3 years including all spares, consumables, Skilled Manpower, tools and tackles all complete. As per Scope attached as AnnexureDesign, Manufacture, Supply, delivery to site, installation, testing & commission of All weather proof Passenger Inclinators in accordance to the Scope and outline specifications mentioned in AnnexureSpesifikasi Incinerator 100kg/jam Spesifikasi dan Daftar Material Dimensi dan Power Capacity Nama Barang : INCINERATORType / Model : PWR-INC-KMN 10Kapasitas : 100kg/Jam (1 m3)Length : 288 cm Width : 147 cm Height : 163 cm Height of Chimney std : 700 cm TOTAL WEIGHT : 8000 kg Panel – timer : Digital Included Auto AlarmFinishing : Hot endured paint Fuel tank : 200 Liter Covering Element from steel : 3-8mm Banyaknya Burner : 2 pcs Banyaknya Blower : 2 pcs Max. Fuel consumption : 15-30 Liter/Jam Max. Elektric consumption : 1100 Watt Bahan bakar : Kerosene / Diesel (solar) Voltage : 220 V / 1 phase / 50 Hz Material 1. PANEL CONTROL Type : Digital Buatan : Local KAMINE ( Panel dan Incinerator satu Merek)Voltage : 220 V / 1 phase / 50 Hz Safety operator : Emergency Stop System : Microkontroller Pengoperasian : Semi AutomaticTemperatur control : Digital Coupler TypeControl panel : Manual dan automaticTipe : Self Standing Type / Wall Mounted TypeMaterial : Mild steelThermocontrol : 2 (Dua) 1200 ºCSet of timer : 0- 2 jamTombol saklar : on/off 2. CONTRUCTIONS Fire Brick : SK 34Castable : R 16Castable : R 14Isolator : Insulating Brick serat tahan panas Keramik 1.450 ⁰ CElement from steel : 3-8 mmFinishing : Cat Fetalit coating, Epoxy Resin (hot-endured paint)Total berat keseluruhan : 8.000 kgKetebalan Dinding Dalam : 21 Cm 3.DIMENSION OF CHAMBER (Dimensi Ruang Bakar) Chamber 1 Ruang Bakar Utama : 100 x 100 x 98 cm = 980.000 cm3 = 0.98 m3Chamber 2 Ruang Bakar Kedua: 40 x 100 x 98 cm = 392.000 cm3= 0.39 m3 4. EXHAUST STACK (Chimney) – Diameter (inch): Ø 10″, 8″-Panjang: 700 cm (7 m) dari permukaan tanah -Cerobong pertama dengan system Cor tipe MWHT-Material Mild steel ( Baja Hitam ) 5. INSTRUMENTATION & KONTROL 1. Suhu Control: Optimal – Model: Digital – Jumlah (unit): 2 (dua) unit – Kontrol Mode: On-Off 2. Power Supply (volt / fase / herts): 15A / 220 V / 1 Phase / 50 Hz 3. Panel kandang: Mild Steel + powder coating 4. Thermocouple: K – Jumlah: 2 (dua) unit – Bahan: Stainless Steel + Ceramic 5. Timer: 0-2 Jam 6. De-ashing: Manual 7. System pembuangan Abu 2 unit 6. PINTU Pintu : Baja ringan dan Linning dengan castable System : Double lock system ( penguncian ganda ) 7. AIR SUPPLY SYSTEM Model / Type: fan sentrifugal 3 “Kapasitas (m3/minute): 3.000 m3/mntStatis Tekanan (mmAq): 98 mmAqPower : 200 watt/unitJumlah (unit): 2 (dua) 8. FUEL SYSTEM Pembakaran Burner:Type: Gun type OM 2NBahan Bakar: Diesel Oil / KeroseneKonsumsi Bahan Bakar: 10-18 ltr / jamPower : 250 wattJumlah unit : 1 unit Type: Gun type OM 2NBahan Bakar: Diesel Oil / KeroseneKonsumsi Bahan Bakar: 10-18 ltr / jamPower : 250 wattJumlah unit : 1 unit 9. THERMOCOPLERuang bakar pertama dan keduaTipe : KProtective tube : Stainless steel + ceramicMax. temperature : 1200 ºCJumlah : 2 unitSistem pemberian umpan : ManualSistem pengeluaran hasil : Manual 10. TANGKI BAHAN BAKARMaterial : Mild steel Kapasitas : 200 liter Horizontal Autoclave 155 LitersSterilizing chamber: Steam-heated via double back wall with integrated steam generatorDoor and lock: Hinged door with quick lock and safety lockDoor seal: Blow-out design, even closure, automatic return without vacuum systemTemperature measurement technology: 2 independent sensors for controlling the steam generator + 1 sensor for sterilizing chamberPreheating keySecurity key switch saves program settingsSterilization phase indicatorsPressurized-air supply: integrated Compressor for door control circuit and pneumatic set valvesFeed water consumption per batch 0.7 to 5.6 litersCooling water consumption per batch for spent-steam condenser 10–25 l at temperatures 15 °CWater-level control: Within the double back wallLow-water safety fuse: Heater Over temperature monitorSterile venting: Membrane filter 0,2um, 0.1 m² hydrophobic, steam-sterillisable, retention 99.5%Control circuits: separate for heater and door seal, process control and monitoringTimer Program start by date and timeSelectable Acoustic alarm at program endTransport security device for door Three Autoclave able (Polypropylene or stainless steel) Pans 5-10L
Medical Incinerator Specification
Capacity Not less than 500Kg/hr.Operation 24hr-7days/week continuous operation.Combustion chamber 2 combustion chamber.Temp. First combustion chamber 800-1000 C. Secandry combustion chamber 1000-1200 C, with the possibility to be upgraded to 1400 C.Combustion Efficiency 99.99%Retention time Of the flow gases not less than 2 Sec in the hot portion.Excess Oxygen concentration Of primary combustion chamber 3-6% max. Refractory The chambers should be lined with high thermal insulating refractory bricks with suitable thickness and with highly temp. resistance. Not less than 1400 C for the first combustion chamber, and not less than 1600 C for the secandry combustion chamber, and at the same time prevent the Temp. of the outside body of the chamber not higher than 70 C.Doors Should be lined with the same bricks, and the edges lined with special suitable insulating material to prevent any gas escaping, and the doors should be kept under negative pressure during the operation.Air Emission Control System With high destruction and removal efficiency (DRE). Not less than 99.9999 as per KEPA.Wet System If the system equiped with a CEMS washing the flow gas with water, then it should be manufactured from suitable anti corrossion materials, and equiped with pH meter to measure and neutralize the water. It should be able to use the water in closed recycled circuit many times before treating/ discharging into the sewage system in compliance with KEPARS.Chemical dosing It should be equiped with suitable autochemical dosing system to control the pH for the water of the wet scrubber system including sensors.Chimney It should be suitable with the capacity and the technical specifications, with height not less than 12m from ground level. With easy opennable sampling point equal about 3 inch, and the optimum sampling locations is at least 8D downstream direction and 2D upstream from any flow disturbancies.Sampling point Should be equiped with a platform located down the sampling point by a distance not less than 1 m, and equiped with suitable stairs from ground to the port with comfortable slope.Ash Removal It should be auto ash removal system.Fuel It should be dual system, such as diesel and natural gas.Feeding System Should be auto feeding system into primary chamber.Control Room Should be equiped with a control panel shows Temp. of the combustion burners, gas monitoring, digital Temp. indecation for the primary/secondary chambers, digital Temp. indication for the gases…etc. it should be also Auto operation, burnures on/off auto lamps switch, auto start/stop for air emission control system, auto gas continuous monitoring system reading and print out of gas emission parameters…etc.Cooling System The primary chamber should be provided with auto cooling systemthrough nozzles to permit direct cooling if the Temp. will be heigher than 1100 C.Inter-lock system The incinerator should be equiped with inter-lock system to prevent feeding the waste to the primary chamber if the combustion Temp. less than 500 C.Flue treatment and cleaning To consist a combined system (wet/dry), using water, lime, active carbon and ceramic filters.Quenching system/Heat exchanger Should be made and manufactured from anti corrosion and acid attack materials such as stainless steel 316 or equivalent.Noise Level Not more than 85 dBA during normal operation.Inaddition The desigh should insure that responsive fail-safe control systems are used. The incinerator should be installed inside closed suitable building with good aeration and ventilation system. The building has facilities for off-loading of wastes from transport vehicles. Auto cleaning system for trucks and waste containers, and cool storage area…etc. The quotation should included list of original spare parts for 7 years. The quotation should include supervising, starting up and training of the operators and ministry of health engineers inside/outside Kuwait. Detailed drawings, catalogs should be included.
Medical Incinerator Specification
Capacity Not less than 500Kg/hr.Operation 24hr-7days/week continuous operation.Combustion chamber 2 combustion chamber.Temp. First combustion chamber 800-1000 C. Secandry combustion chamber 1000-1200 C, with the possibility to be upgraded to 1400 C.Combustion Efficiency 99.99%Retention time Of the flow gases not less than 2 Sec in the hot portion.Excess Oxygen concentration Of primary combustion chamber 3-6% max. Refractory The chambers should be lined with high thermal insulating refractory bricks with suitable thickness and with highly temp. resistance. Not less than 1400 C for the first combustion chamber, and not less than 1600 C for the secandry combustion chamber, and at the same time prevent the Temp. of the outside body of the chamber not higher than 70 C.Doors Should be lined with the same bricks, and the edges lined with special suitable insulating material to prevent any gas escaping, and the doors should be kept under negative pressure during the operation.Air Emission Control System With high destruction and removal efficiency (DRE). Not less than 99.9999 as per KEPA.Wet System If the system equiped with a CEMS washing the flow gas with water, then it should be manufactured from suitable anti corrossion materials, and equiped with pH meter to measure and neutralize the water. It should be able to use the water in closed recycled circuit many times before treating/ discharging into the sewage system in compliance with KEPARS.Chemical dosing It should be equiped with suitable autochemical dosing system to control the pH for the water of the wet scrubber system including sensors.Chimney It should be suitable with the capacity and the technical specifications, with height not less than 12m from ground level. With easy opennable sampling point equal about 3 inch, and the optimum sampling locations is at least 8D downstream direction and 2D upstream from any flow disturbancies.Sampling point Should be equiped with a platform located down the sampling point by a distance not less than 1 m, and equiped with suitable stairs from ground to the port with comfortable slope.Ash Removal It should be auto ash removal system.Fuel It should be dual system, such as diesel and natural gas.Feeding System Should be auto feeding system into primary chamber.Control Room Should be equiped with a control panel shows Temp. of the combustion burners, gas monitoring, digital Temp. indecation for the primary/secondary chambers, digital Temp. indication for the gases…etc. it should be also Auto operation, burnures on/off auto lamps switch, auto start/stop for air emission control system, auto gas continuous monitoring system reading and print out of gas emission parameters…etc.Cooling System The primary chamber should be provided with auto cooling systemthrough nozzles to permit direct cooling if the Temp. will be heigher than 1100 C.Inter-lock system The incinerator should be equiped with inter-lock system to prevent feeding the waste to the primary chamber if the combustion Temp. less than 500 C.Flue treatment and cleaning To consist a combined system (wet/dry), using water, lime, active carbon and ceramic filters.Quenching system/Heat exchanger Should be made and manufactured from anti corrosion and acid attack materials such as stainless steel 316 or equivalent.Noise Level Not more than 85 dBA during normal operation.Inaddition The desigh should insure that responsive fail-safe control systems are used. The incinerator should be installed inside closed suitable building with good aeration and ventilation system. The building has facilities for off-loading of wastes from transport vehicles. Auto cleaning system for trucks and waste containers, and cool storage area…etc. The quotation should included list of original spare parts for 7 years. The quotation should include supervising, starting up and training of the operators and ministry of health engineers inside/outside Kuwait. Detailed drawings, catalogs should be included.